//evt/charging
Charging
Networks, connectors, reliability, costs. Regional pricing verified before publication.
■ Now filing — first stories published 2026-10-11
//evt/charging/latest
Latest on this desk
The verified stories this desk has filed so far, newest first.
- //evt/chargingBYD’s megawatt flash-charging network handled 1.22 million sessions in China’s Golden Week
Holiday travel data released October 9 shows the network serving 540,000 users across 341 cities — and the busiest single charging gun moved 74 cars in a day.Doug Simmons · 2026-10-11 - //evt/chargingNACS vs CCS: the connector war, explained
One small plug, one bulky one, and a decade of incompatibility — how Tesla’s connector became SAE J3400 and ended North America’s charging split.Doug Simmons · 2026-10-11 - //evt/chargingElectrify America takes its chargers white-label: ‘Powered by’ passes 100 stations
Retailers from Costco to Wawa now run their own branded fast chargers on Electrify America’s hardware and operations — nearly 600 chargers and counting.Doug Simmons · 2026-10-11 - //evt/chargingIONNA more than doubled in 2026, passing 180 live sites
The automaker-backed network is now the leader in 400 kW stalls — and the steepest ramp yet toward its 30,000-bay 2030 target.Doug Simmons · 2026-10-11 - //evt/chargingHow 2026 changed EV charging: the buildout in numbers
1.22 million holiday sessions, 1.19 million swaps, 180 new IONNA sites, and white-label chargers at Costco — the year charging infrastructure became the story.Doug Simmons · 2026-10-11 - //evt/chargingNACS in 2026: the year the connector war ended and the plug wars began
IONNA opened its first all-NACS sites, Rivian went NACS-only, Stellantis took the standard global — and NACS now accounts for roughly half of all U.S. public DC fast-charging ports.Nathan Pryce · 2026-10-11
//evt/charging/coverage
What this desk files
Coverage areas plus the stories filed so far on this desk.
- Network expansionWhere chargers are going in — and whether they work when they get there.Now filing
- Connector standardsNACS, CCS, and the plug you will actually find on your route.Now filing
- ReliabilityUptime claims checked against what drivers experience.Now filing
- Home chargingEquipment guidance. Incompatible or unsafe equipment never gets a recommendation.Now filing
//evt/charging/desk
The desk
The editor accountable for every story on this wire.
Doug Simmons
Policy, markets & charging infrastructure
Regulation, incentives, market data, and the charging networks drivers actually depend on - compatibility verified by region, pricing verified before publication.
//evt/charging/pipeline
In the pipeline
Technical explainers feeding this desk — researched against documented sources, published starting at launch.
- In the pipelineHow Fast Charging Really WorksCharging curves, not peak numbers: what actually determines the time from ten to eighty.
- In the pipelineEV Charging Connector StandardsNACS, CCS, and the plug you will actually find on your route.
- In the pipelineEvaluating Home Charging EquipmentWhat to look for before you buy, and what to avoid. Incompatible or unsafe equipment never gets a recommendation.
//evt/charging/protocol
Verification on this desk
The rules this desk files under — the full protocol is on our How we verify page.
- Sources
Two sources, always
Every factual claim traces to a documented source. News coverage follows a two-source rule.
- Standards
Specs carry their standard
EPA, WLTP, manufacturer estimate, and independent test results are labeled as such. Never blended, never compared as identical measurements.
- Disclosure
Disclosures on the page
Vehicle loans, affiliate relationships, sponsorships, manufacturer assistance: disclosed on the page, every time.